DIY build notes

How I built my home climbing wall

The guide I followed, what I bought, what it cost, and what I'd do differently.

The finished wall from an angle: an overhanging plywood wall covered in holds, with the 2x6 framing visible down the left edge

The nearest climbing gym is an hour from my house. Between the drive there, the drive back and the kids, I just stopped going. So I built a wall at home.

The lumber showed up on December 16, 2024, I was climbing on it by January 7, and the top panel and the kicker went on two weeks after that. That is the pace of a dad with a full-time job, so you may well be faster.

Only the main panel overhangs. The kicker at the bottom and the triangular panel at the top are both vertical.

The angle came from the footprint I could live with. The wall shares a room with my family, a couch and a TV on the opposite wall. Yours can be whatever you want.

This is what I did in my house. It is not engineering advice. A wall like this puts a lot of load on whatever it hangs from, and that part is different in every house. The guide below says to talk to an engineer, and so do I.

The guide I followed

I used How to Build a Home Bouldering Wall, a free PDF from Metolius. It covers design, framing, attaching to the house, drilling, T-nuts and holds, with diagrams. Read it first. Everything on this page is what I did with it.

I did three things differently. I drilled one sheet at a time instead of a stack. I used a 7/16 in. bit instead of 1/2 in. And I hung the ledgers with #10 x 5 in. deck screws, where the guide calls for heavier #14 screws.

The build in photos

Bare 2x6 frame leaning off the house wall, before any plywood 1 2 3 4 5 6 7
December 26, 2024. Frame done, no plywood yet.
  1. Lower ledger: three 2x6s stacked on the house wall.
  2. A joist hanger holds the foot of each joist.
  3. Seven 2x6 joists. The plywood screws to these.
  4. Blocking between the joists, at the height where the two sheets meet.
  5. Upper ledger on the house wall.
  6. Struts run from the upper ledger out to the top of the frame, also in hangers.
  7. Top plate across the joists.

Both ledgers are screwed into the wall studs with #10 x 5 in. deck screws. Everything in this photo hangs off the house wall.

Two drilled plywood sheets, one leaning on the frame and one flat on the floor 1 2 3
January 2, 2025. Both sheets drilled before they went up.
  1. First sheet. No grid: I drilled at random, about 3 to 4 inches apart.
  2. Second sheet. I drilled them one at a time.
  3. Rubber mat already down.
Lower plywood sheet screwed to the frame, upper half of the frame still open 1 2 3 4
January 4, 2025. First sheet on.
  1. Lower sheet screwed to the joists. Its top edge lands on the blocking.
  2. Open frame, waiting for the second sheet.
  3. The second sheet.
  4. Crash pads stored on the struts behind the wall.
Both plywood sheets hung, no holds yet, black rubber mat on the floor in front 1 2 3
Later the same day. Both sheets up.
  1. Gap up to the sloped ceiling. The triangular top panel went here later.
  2. No kicker yet. The panel stops above the baseboard.
  3. Rubber mats on the floor. The crash pads go on top.
The wall with the triangular top panel and the kicker added 1 2 3 4
January 22, 2025. Top panel and kicker on.
  1. Top panel. It is vertical, a triangle that fills the space up to the sloped ceiling.
  2. Main panel.
  3. Kicker at the bottom, also vertical.
  4. End of the upper ledger and its strut, same as in the first photo.

The top panel is the only part tied into the ceiling. It is about 2 feet tall on one side and tapers to nothing on the other, so the ceiling is only helping hold the very top of the wall. I spread that attachment across three ceiling joists instead of loading one. It felt safe to me. That was a judgment call, and it is the kind of call the "talk to an engineer" line is for.

Close-up of the 2x6 that ties the top panel framing into the ceiling joists 1 2 3
The ceiling tie-in, up close.
  1. 2x6 run across three ceiling joists.
  2. One set of screws into each joist. The third set is hidden behind the upright.
  3. Upright that frames the tall side of the top panel.
The finished wall from the side, showing the framing behind the left edge 1 2 3 4 5 6 7 8
November 2026. The side of the wall today.
  1. 2x6 screwed across three ceiling joists. This is what holds the top panel.
  2. Short upright that frames the tall side of the top panel.
  3. Storage back here, because why not. It also means I can still get to the back of the wall.
  4. End of the upper ledger, with its hanger.
  5. Strut out to the edge of the frame.
  6. Edge joist.
  7. Lower ledger.
  8. Kicker.

What it cost

These are my actual receipts from December 2024. Prices have moved since.

WhatWherePaid
2x6 x 8 ft fir, 18 boardsHome Depot$147.96
Simpson LUS joist hangers for 2x6, 14Home Depot$20.72
#10 x 5 in. deck screws, box of 50Home Depot$18.87
Delivery and taxHome Depot$42.31
T-nuts, 3/8"-16, zinc, 1,160Way too many. See below.Bolt Depot$135.72
Socket cap screws, 3/8"-16 x 2 in., 249Bolt Depot$86.63
Shipping and taxBolt Depot$32.01
Drill guide attachment (Milescraft DrillMate)Amazon$31.51
7/16 in. spade bitAce Hardware$6.85
Frame, hardware and tools$522.58
Plywood, 23/32 in. x 4 ft x 8 ft cabinet grade, 3 sheetsThis is the November 2026 price, $49.77 a sheet.Home Depotabout $150
Holds, first order: 25 lb of factory seconds with bolts, plus three small setsEscape Climbing$459.80
To get climbingabout $1,130
Stall mats, 4 ft x 6 ft x 3/4 in. Optional.November 2026 price. I bought four and use two.Big Rabout $50 each

Crash pads are not in there. Mine were secondhand or ones I already had. The holds I added later are not in there either.

Where I overspent: the T-nuts and bolts came to $222 before shipping. I bought way, way too many. About a third of that would have covered it. Escape will also add the right-sized bolts to a holds order, so most of the 249 bolts I bought separately were not needed.

On plywood: I used three sheets. Two go on sideways for the main panel. You will likely need the third for the kicker at least, and a top panel if you add one, with some left over.

What I'd tell you before you start

The floor

In front of the wall I put down rubber horse stall mats: 4 ft x 6 ft, 3/4 in. thick, from Big R. They were about $50 each when I checked in November 2026. That is more than I paid, and still a good deal for 3/4 in. of rubber. Any farm store will have something like them.

These are optional. I wanted them for exercises and warm-ups. I bought four and ended up using two.

One warning: they smell like rubber, and the smell takes a while to go away.

The mats are not fall padding. The crash pads on top are what you land on. Mine came off Facebook and Craigslist, plus the ones I already had from bouldering outside. I did not buy any new.

Holds

Most of my holds are from Escape Climbing's factory seconds. They are sold by the pound, so it's a great deal.

I started with 25 pounds and had them add the bolts. After that I ran their $100 a month hold subscription for four months, then bought another 10 pounds in 2026. All in, that is about $1,000 on holds over two years.

The wall straight on, densely set with holds of every color
November 2026. Two years of holds.

You can leave a note with your order saying what your wall angle is and what you are after, and they pick holds to match. I did that when I wanted easier holds for my kids.